Seal of the State of Hawaii

Department of Transportation

News Release

For Immediate Release: August 7, 2014
14-0268

OAHU LANE CLOSURES FOR THE WEEK OF AUGUST 9 – AUGUST 15

PLEASE NOTE: Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

— H-1 FREEWAY —

WAIMALU TO WAIPAHU (NIGHT WORK)

Two to three right lanes closed on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu Off-Ramp (Exit 10) and the Waipahu Off-Ramp (Exit 8B) on Monday, August 11, through Thursday morning, August 14, from 7:30 p.m. to 4:30 a.m., for road widening and utility installations.

For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.

WAIMALU TO WAIPAHU

One right lane closed on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu Off-Ramp (Exit 10) and the H-1/H-2 Split on Monday, August 11, through Thursday, August 14, from 9:30 a.m. to 2:30 p.m., for road widening and utility installations.

For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.

— H-2 FREEWAY —

WAIPIO (WEEKEND/NIGHT WORK)

Lane closures on the H-2 Freeway in the Honolulu-bound direction between the Ka Uka Boulevard Off-Ramp (Exit 2) and the Waiawa Road Overpass on Sunday, August 10, through Thursday, August 14, from 8:30 p.m. to 4 a.m. for the rail project.

— H-3 FREEWAY —

AIEA (WEEKEND/NIGHT WORK)

Lane closures on all On and Off-Ramps at the Halawa Interchange on the H-3 Freeway in the southbound (Town-bound) from Monday night, August 11, through Thursday morning, August 14, from 9 p.m. to 4:30 a.m., for pavement installations.

HALAWA TO KANEOHE

Lane closures on the H-3 Freeway in both directions between the Halawa Interchange and the Kaneohe Marine Core Base on Thursday, August 14, from 9 a.m. to 3 p.m., for guardrail installations.

— FARRINGTON HIGHWAY —

MAILI

Lane closures on Farrington Highway in the northbound direction between Kaukama Road and Maliona Street on Monday, August 11, through Thursday, August 14, from 8:30 a.m. to 3 p.m. for pavement marking installation.

— KALANIANAOLE HIGHWAY —

HAWAII KAI

Lane closures on Kalanianaole Highway in the east bound direction between Kirkwood Street and West Halemaumau Street on Tuesday, August 12, through Thursday, August 14, from 9 a.m. to 3 p.m., for cold planning and resurfacing as part of the Kalanianaole Highway Resurfacing project.

— KAMEHAMEHA HIGHWAY —

WAHIAWA (NIGHT WORK)

Lane closure on Kamehameha Highway in the southbound direction between Kilani Avenue and Olive Avenue on Tuesday, August 12, from 8 p.m. to 4 a.m., for utility replacements.

MILILANI

Partial closures on Kamehameha Highway in the southbound direction at the Lumiaina Street intersection Monday, August 11, through Thursday, August 14, from 8:30 a.m. to 3 p.m. for utility installations and sidewalk repairs.

MILILANI

Partial closures on Kamehameha Highway in the southbound direction between Ka Uka Boulevard and Waipahu Street on Monday, August 11, through Thursday, August 14, from 8:30 a.m. to 3 p.m. for utility installation.

LAIE TO PUNALUU

Lane closures on Kamehameha Highway in the northbound direction between Punaluu Valley Road and Cackle Fresh Egg Farm Road on Monday, August 11, through Thursday, August 14, from 8:30 a.m. to 2:30 p.m., daily, for utility relocation.

— ALA MOANA BOULEVARD —

KAKAAKO (WEEKEND/NIGHT WORK)

NIGHT WORK:

  • Lane closures on Ala Moana Boulevard in both directions between Punchbowl Street and Kamakee Street on Sunday, August 10, through Thursday morning, August 14, from 9 p.m. to 5 a.m., nightly, for utility installations.

DAY WORK:

  • Lane closure on Ala Moana Boulevard in both directions between Kamakee Street and Punchbowl Street, on Monday, August 4, through Thursday, August 7, from 8:30 a.m. to 3 p.m., for utility installations.

— VINEYARD BOULEVARD —

HONOLULU

Single left lane closure on Vineyard Boulevard in the eastbound direction between Palama Street and Pua Lane on Monday, August 11, through Thursday, August 14, from 8:30 a.m. to 3 p.m., for median and curb reconstruction.

The Vineyard Boulevard Resurfacing Project will resurface 10.5 lane miles from Palama Street to the H-1 Freeway On-Ramp. The repairs include sidewalks, curbs, gutters, installing bus pads, replacing existing traffic signal heads, energy-efficient, LED optical units, extending left turn lanes at the Palama Street and Liliha Street intersections, and landscaping.

HONOLULU

Lane closure on Vineyard Boulevard in the eastbound direction between Liliha Street and Pali Highway on Thursday, August 14, from 8:30 a.m. to 3 p.m. for pavement reconstruction.

— KANEOHE BAY DRIVE —

KANEOHE

Single lane closure on Kaneohe Bay Drive in both directions between Kamehameha Highway and Nanamoana Street on Monday, August 11, through Friday, August 14, from 8:30 a.m. to 3 p.m. for the Kaneohe Bay Drive Rehabilitation Project.

— LILIHA STREET —

KALIHI

Right lane closed on Liliha Street in the northbound, direction between North Vineyard Street and North Kuakini Street on Monday, August 11 through Thursday, August 14, from 8:30 a.m. to 3 p.m.,daily, for water main installations.

— KUNIA ROAD —

VILLAGE PARK

Single lane closure on Kunia Road in the southbound direction between Plantation Road and Kupuna Loop on Monday, August 11, through Thursday, August 14 from 8:30 a.m. to 3 p.m. daily, for asphalt paving.

###

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.