Department of Transportation
News Release
For Immediate Release: February 7, 2014
14-0040
OAHU LANE CLOSURES
FOR THE WEEK OF FEBRUARY 8 – 14
PLEASE NOTE: Lane closure schedules may change at any time without further notice.
All projects are weather permitting.
— H-1 FREEWAY —
PEARL CITY (NIGHT WORK)
Three right lanes will be closed on the H-1 Freeway in the eastbound direction between the H-1/H-2 Merge and the Pearlridge/Waimalu Off-Ramp (Exit 10) on Monday night, February 10, through Friday morning, February 14, from 6 p.m. to 4:30 a.m., nightly, for viaduct deck repairs.
For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.
PEARL CITY (NIGHT/WEEKEND WORK)
Three right lane closures on the H-1 Freeway in the eastbound direction between the H-1/H-2 Merge and the Pearl Ridge/Waimalu Off-Ramp (Exit 10) on Sunday, February 9, from 3:30 p.m. to 4:30 a.m., for viaduct deck repairs.
For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.
HONOLULU (NIGHT/WEEKEND WORK)
Lane closures on the H-1 Freeway in both directions between Likelike Highway and Ward Avenue on Sunday, February 9, through Friday, February 14, from 9 p.m. to 5 a.m., for the H-1 Rehabilitation Project.
For more information, please visit the project website at www.H1Rehab.com or call the project hotline at (808) 735-7465.
PEARL CITY TO WAIPAHU
Center lane closure on the H-1 Freeway in the westbound direction between the Waipahu Off-Ramp (Exit 8B) and the Waikele/Waipahu Off-Ramp (Exit 7) on Monday, February 10, through Friday, February 14, from 9:30 a.m. to 2:30 p.m., daily, for roadwork st the H-1/H-2 Split.
For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.
— FARRINGTON HIGHWAY —
MAILI
Lane closures on Farrington Highway in the southbound direction between Liliana Street and Hakimo Road on Monday, February 10, through Friday, February 14, from 8:30 a.m. to 3 p.m., daily, for pavement resurfacing.
MAKAHA
Single lane closure on Farrington Highway in the eastbound direction between Jade Street and Orange Street on Monday, February 10, through Friday, February 14, from 8:30 a.m. to 3 p.m., daily, for drainage maintenance. Traffic will be contraflowed using the remaining open lane.
During these hours, the east entrance to Lahilahi Street may also be closed as needed. Access will still be available at the west entrance to Lahilahi Street.
WAIANAE
Lane closures on Farrington Highway in the southbound direction between Ala Hema Street and Lualualei Homestead Road on Monday, February 10, through Friday, February 14, from 8:30 a.m. to 3 p.m., for drain line work.
WAIPAHU (WEEKEND/NIGHT WORK)
Left lane closures on Farrington Highway in both directions between Old Fort Weaver Road and Kamehameha Highway on Sunday, February 9, through Friday, February 14, from 7 p.m. to 6 a.m., for the rail project.
— IROQUOIS POINT ROAD —
EWA
Single lane closures on Iroquois Point Road in both directions between Keaunui Drive and Hoomaka Street on Monday, February 10, through Friday, February 14, from 8:30 a.m. to 3 p.m., daily, for sidewalk construction. One lane in each direction will be closed at a time.
— KUNIA ROAD —
WAIPAHU (WEEKEND WORK)
Left lane closure on Kunia Road in both directions between Kupuna Loop and Farrington Highway at the H-1 Freeway overpass on Saturday, February 8, from 4 a.m. to 8 a.m., for road maintenance.
###
Leave a Reply
Want to join the discussion?Feel free to contribute!