Department of Transportation
News Release
For Immediate Release: May 15, 2014
14-0154
OAHU LANE CLOSURES FOR THE WEEKEND OF MAY 16 – MAY 18
PLEASE NOTE: Lane closure schedules may change at any time without further notice.
All projects are weather permitting.
— H-1 FREEWAY —
HONOLULU (NIGHT/WEEKEND WORK)
Full closures on the H-1 Freeway in the eastbound direction between Middle Street and Ward Avenue Overpass on Sunday night May 18, through Friday morning, May 23, from 8 p.m. to 5 a.m., nightly, for the H-1 Rehabilitation Project.
For more information, please visit the project website at www.H1Rehab.com or call the project hotline at (808) 735 -7465.
The H-1 Rehabilitation project will upgrade the freeway sub-surface and asphalt to provide a longer-lasting, smooth riding surface, provide an additional lane in each direction, install upgraded lighting, improve drainage, and install glare screens along the median.
AIRPORT (NIGHT/WEEKEND WORK)
Left lane closures on the H-1 Freeway in the eastbound direction between the Hickam AFB/Naval Base Off-Ramp (Exit 15) and Airport Off-Ramp (Exit 16) from 9 p.m., Friday night, May 16, through 3 p.m., Sunday, May 18, for viaduct deck repairs.
Airport Viaduct improvements include concrete deck replacements, expansion joint repairs, and pavement restriping. Work is located between the Pearl Harbor Interchange and the Keehi Interchange.
— ALA MOANA BOULEVARD —
KAKAAKO (WEEKEND/NIGHT WORK)
NIGHT WORK:
- Lane closures on Ala Moana Boulevard in the westbound direction between Smith Street and Kamakee Street on Sunday night, May 18, through Friday morning, May 23, from 8 p.m. to 5 a.m., nightly, for utility installations.
- Lane closures on Ala Moana Boulevard in the eastbound direction between Cooke Street and Ward Avenue on Sunday night, May 18, through Friday morning, May 23, from 8 p.m. to 5 a.m., nightly, for roadway work.
— NIMITZ HIGHWAY —
HONOLULU (WEEKEND/NIGHT WORK)
Multiple lane closures on Nimitz Highway in both directions between Punchbowl Street and Pacific Street on Sunday, May 18, through Thursday, May 22, from 8:30 p.m. to 4 a.m., for soil testing.
— VINEYARD BOULEVARD —
HONOLULU (WEEKEND/NIGHT WORK)
Lane closures on Vineyard Boulevard in the eastbound direction between Palama Street and Liliha Street from 8:30 p.m., Friday, May 16, through 5 a.m., Monday morning, May 19, for bus pad installations.
The Vineyard Boulevard Resurfacing Project will resurface 10.5 lane miles from Palama Street to the H-1 Freeway On-Ramp. The repairs include sidewalks, curbs, gutters, installing bus pads, replacing existing traffic signal heads, energy-efficient, LED optical units, extending left turn lanes at the Palama Street and Liliha Street intersections, and landscaping.
###
Leave a Reply
Want to join the discussion?Feel free to contribute!